What Does SEK 1 Million Get You in App Development?
SEK 1 million covers a medium-complexity app for both iOS and Android, built with cross-platform technology and its own backend. Typical scope: login, a few core flows, push notifications, payment, and a simple admin interface. The budget covers design, development, testing, and launch – but advanced features like real-time data and heavy integrations often wait for version 2.
SEK 1 million is a common budget level for a first real app project – enough for a well-built product, not enough for everything you might want. Here’s exactly what the budget gets you in 2026: which features fit, how the money breaks down across the project, and what’s smartest to leave for later.
Where the million goes: the phase breakdown
A rule of thumb for a well-run app project is that the money breaks down roughly like this:
| Phase | Share of budget | For SEK 1 million |
|---|---|---|
| Discovery and design | 15–20% | SEK 150,000–200,000 |
| Development | 50–60% | SEK 500,000–600,000 |
| Testing and QA | 10–15% | SEK 100,000–150,000 |
| Launch and buffer | 10–15% | SEK 100,000–150,000 |
The temptation is to trim design and testing to fit in more features. Resist it: an app with fewer, well-built flows always beats one with many half-finished ones.
The breakdown also works as a monitoring tool as the project moves forward. If development starts eating into the testing budget, that’s an early warning sign – and the right response is to trim the scope, not cut quality assurance. An app that launches buggy loses users who rarely come back.
A feature set that fits
Here’s what the scope of a million-kronor app can look like in practice – a medium-complexity app built in React Native for both iOS and Android, with its own backend:
- Accounts and login, ideally with BankID
- Two to four core flows, such as booking, ordering, or tracking
- Push notifications and basic email sending
- Payment through an established payment service
- A simple admin interface for your staff
- Basic usage statistics
Just as important is what doesn’t fit. A million rarely covers both a consumer app and a large internal system in the same project, or more than one heavier integration with a business system – those compete for the same hours as the core flows. But the set above is a fully launchable product that holds up for real users. At Weapp we’ve built consumer apps in this class and beyond – like Sejfa, a digital home insurance product for young adults – and the pattern is the same: the core flows decide, not the length of the feature list.
What typically waits for version 2
Just as important as what fits is what gets deliberately pushed back. Common version 2 candidates:
- Real-time features like live chat or shared live location – expensive to build and to run.
- Business-system integrations beyond the most critical one.
- More languages than Swedish and English.
- Advanced analytics and personalization – these need real user data first.
- Widgets, watch apps, and other platform extras.
Putting them in version 2 isn’t a scoping failure – it’s letting real usage decide where the next million does the most good. A good test for every item on the wish list: would users abandon the app without it in the first three months? If not – version 2.
Worked example: a booking app for SEK 1 million
Say a service company wants an app where customers book times, pay, and get reminders. Discovery and design take six weeks and cost SEK 180,000. Development – accounts, booking flow, payment, notifications, and an admin interface – lands at SEK 550,000 over three to four months. Testing and store launch take SEK 120,000, leaving SEK 150,000 as buffer. If payment turns out to need a trickier integration than expected, the buffer absorbs it – that’s exactly what it’s for, and why new requests aren’t allowed to touch it. If it stays untouched instead, it funds the first two months of further development after launch. Total: a launched product in around five months, with the margins intact.
Getting the most out of the budget
Three things separate million-kronor projects that succeed from the ones that blow the budget: a clearly prioritized feature list where half is marked “can wait,” a buffer that doesn’t get eaten by new ideas along the way, and the decision to launch once the core is done instead of once everything is done. Want a concrete picture of what your idea fits within a million? Get in touch and we’ll run the numbers.
Frequently asked questions
Does SEK 1 million cover both iOS and Android?
Yes, if the app is built with a cross-platform framework like React Native, where most of the code is shared between platforms. Choose two separate native apps instead, and a large part of the million goes to duplicated work, shrinking the scope by a corresponding amount.
How many hours of work does SEK 1 million cover?
At Swedish agency hourly rates of SEK 900–1,400, a million covers roughly 700–1,100 hours. That's enough for four to six months of work for a small team with a developer, a designer, and part-time project management.
What does the app cost after the million is spent?
Expect 15–25 percent of the development cost per year in maintenance and further development, plus hosting at a few thousand kronor a month. For a million-kronor app, that means roughly SEK 150,000–250,000 a year – a line item that belongs in the budget before the project even starts.
What happens if the project looks set to blow the budget?
A well-run project catches it early, not in the final phase. The fix is almost always to reprioritize: move features to version 2 instead of increasing the budget. That's why the buffer and a clearly prioritized feature list need to be in place from the start.
Is it better to start with a smaller MVP than spend the whole million?